Mai Beni Hydropower Project - 9.51 MW

Located in the middle reach of Mai River in Ilam district of eastern part of Nepal, Mai Beni Hydropower Project is a Run-of-River type hydropower project with an installed capacity of 9.51 MW. The Project is the pilot project of Urja Developers Pvt. Ltd., which embarked on construction in May 2018. The components of the project lie between an elevation of 490m and 645m above mean sea level. 