Samling Power Company Limited

Samling Power Company

Project

Mai Beni Hydropower Project - 9.51 MW

Located in the middle reach of Mai river in Ilam district of eastern part of Nepal, Mai Beni Hydropower Project is a Run-of-River type hydropower project with an installed capacity of 9.51 MW. The Project is the pilot project of Urja Developers Pvt. Ltd. The components of the project lie between an elevation of 490m and 645m above mean sea level. All the major components of the project are within 5 km distance from Mechi highway. The project is in operation since September 17 2021.

Gallery

Projects and Events

AGM 2074/75

AGM 2075/76

AGM 2076/77

AGM 2077/78

AGM 2078/79

Contact Us